Boilers, Chillers December 7, 2017

Case study: Hospital central utility plant

A hospital needed a replacement central utility plant that complied with current codes.

By Richard Vedvik, PE, IMEG Corp.
Electrical and Power December 7, 2017

Case study: Hospital generator upgrade

A hospital needed to upgrade emergency power equipment with a new generator while maintaining some current equipment.

By Richard Vedvik, PE, IMEG Corp.
Electrical and Power December 6, 2017

Case study: Generator replacement

A hospital needed to increase its emergency generator capacity to 4 MW and provide for future expansion while using the existing generator building.

By Richard Vedvik, PE, IMEG Corp.
Electrical and Power December 6, 2017

Case study: Chiller addition adds power complexity

In this case, the building owner needed to increase generator capacity to accommodate a surgery expansion and add an electric centrifugal chiller on emergency power.

By Richard Vedvik, PE, IMEG Corp.