Richard Vedvik, PE, IMEG Corp.
Articles
Boilers, Chillers
December 7, 2017
Case study: Hospital central utility plant
A hospital needed a replacement central utility plant that complied with current codes.
By Richard Vedvik, PE, IMEG Corp.
Electrical and Power
December 7, 2017
Case study: Hospital generator upgrade
A hospital needed to upgrade emergency power equipment with a new generator while maintaining some current equipment.
By Richard Vedvik, PE, IMEG Corp.
Electrical and Power
December 6, 2017
Case study: Generator replacement
A hospital needed to increase its emergency generator capacity to 4 MW and provide for future expansion while using the existing generator building.
By Richard Vedvik, PE, IMEG Corp.
Electrical and Power
December 6, 2017
Case study: Chiller addition adds power complexity
In this case, the building owner needed to increase generator capacity to accommodate a surgery expansion and add an electric centrifugal chiller on emergency power.
By Richard Vedvik, PE, IMEG Corp.